Client: Valais State Hospital
Completion time: 2016
Project Size: 66675 m²
Number of beds: 450
Location: Sion, Switzerland
The future medical campus is centered around the axis between Xiyong Castle and the old hospital. The finger-shaped buildings extending to the north and south naturally integrate the surrounding forest green spaces into the interior of the buildings. The medical street located at the center enjoys natural northern light from the roof. The two-story low-rise design facilitates freer and more convenient connections throughout the hospital, while the terrain changes help to further conceal the new hospital district within the valley’s green landscape.