Client: Town of Fully
Completion time: 2016
Project Size: 7000 m²
Location: Fully, Switzerland
The two buildings are designed with an offset arrangement, yet they remain functionally connected. This intentional separation creates the visual impression of distinct structures while simultaneously fostering a sense of intimacy at the school’s central area and optimizing the available space on the site.